Difference between revisions of "Clary UPS"
Jump to navigation
Jump to search
Line 15: | Line 15: | ||
== Summary == | == Summary == | ||
This UPS was acquired from the HAFB Contracting Office in 2001, along with [[Atlantis]]. It had a multi-tap transformer, and I had to re-tap it from 240VAC to 120VAC operation. It served as a UPS for the entirety of the computer room in [[Category:The Trailer]]. | This UPS was acquired from the HAFB Contracting Office in 2001, along with [[Atlantis]]. It had a multi-tap transformer, and I had to re-tap it from 240VAC to 120VAC operation. It served as a UPS for the entirety of the computer room in [[:Category:The Trailer]]. | ||
[[Category:Trailer Tragedy of 2004]] | [[Category:Trailer Tragedy of 2004]] |
Latest revision as of 21:20, 13 April 2019
Summary
This UPS was acquired from the HAFB Contracting Office in 2001, along with Atlantis. It had a multi-tap transformer, and I had to re-tap it from 240VAC to 120VAC operation. It served as a UPS for the entirety of the computer room in Category:The Trailer.